Preparations before shutting down the hot air furnace for aquaculture water heating

banner

Preparations before shutting down the hot air furnace for aquaculture water heating

August 24, 2026

Regular inspections are necessary during the use of aquaculture hot blast stoves to monitor their performance status, identify potential problems, and take appropriate measures. What procedures need to be performed before shutting down an aquaculture hot blast stove?


  • Before sealing the stove, take measures such as edge development to ensure stable and smooth operation, active hearth, and sufficient furnace temperature, preventing material collapse and hanging.

  • Before sealing, the slag basicity should not be too high. The amount of limestone can be appropriately reduced, and a small amount of manganese ore can be added to maintain the slag basicity at 1.00-1.05 and the MnO content between 1.0%-2.0% to ensure sufficient slag fluidity.

  • Damaged air and slag inlets should be replaced promptly, and the inlet and outlet water of burnt cooling walls should be shut off.

  • The sealing material of the hot air furnace for aquaculture water heating also consists of clean coke, empty material and normal light material. The hearth and belly of the furnace are fully filled with coke, while the waist and lower part of the furnace body can be filled with empty coke and normal light material according to the length of sealing time. The longer the sealing time, the lighter the load of light material.


NEED A CUSTOM VENTILATION SOLUTION?

Direct Factory Support & Selection

Tell us about your project requirements. Our engineers are ready to design the perfect system for your farm or factory.

123456

*******@**********.com

+86-18853615789

***

code